EJD · PDI · RDI
Three documents, in this order, required by ANP Resolution 817/2020.
- EJD: Why the installation is leaving operation.
- PDI: The removal plan for what is in the field, with cost and timing.
- RDI: The report of what was actually carried out.
The automatic schedule follows a fixed table per basin: a factor that lengthens each activity and the restriction months, when work at sea makes less progress. In Campos, for example, the table marks June, July and August. When the wave data service responds, the PDF also shows the sea window for the last year, by wave height, and the recommended months for the campaign.
Demonstration scenarios. Not regulatory filings.